|
For comprehensive
|
|
||
|
|
||
|
Name of the Proyect: Residential Condominium FFPI, river works, usage of soil movement and materials - BLACK STALLION HILLS. Administrative File # D1-1350-2008- SETENA represented by Corporation Damrod CRC, S.A., and Esteban Chaverri Jiménez. Location Province : Guanacaste, County: Santa Cruz , District: Tamarindo, Chartographic Sheet: Villareal, Esc: 1:50.000, Coordinates: 339-341 North / 252, 254 West, Cadastral Survey # G-599884-1999 and G-105698-2006, Farm # 017160-000 and 009029-000. PROJECT DESCRIPTION: The activity comprises the construction of a 203 lot condominium for prymary individualized filial farms with average areas of 1500 to 3000 square meters each, 11 of which will be for commercial use. Also it counts with 21.800,00 lineal meters of roads with sidewalks, curves, sanitary and pluvial water system, electric system, drinkable water and public light systems. Besides, the project will have a 135 square meters access building and security post. Filial #15 with 2149,38 square meters will have a two-stories office complex with a floor area of about 1800 square meters. The recreation facilities of the condominium will have an area of 18220,30 square meter, and it will have 2 swimming pools, dressing facilities, bathrooms, showers, a restaurante, spa, jaccuzzi, sauna, gym, 2 tennis courts, and a court for several uses. It is also included 35 works in the river beds related to the crossing of creeks, with sewage systems and protection measurements such retaining walls and 2 small bridges. Filial #186 located on the sourthern sections with an
area of 168648,55 square meters is destined to harbor a 21 room condo-hotel
on the highest part. Filial # 187 is destined for commercial use comprising
a building for a casual restaurant and commercial establisments of 820
square meters, a service area of 350 meters, a barn with administrative
facilities and services, corral and display grounds for 60 horses with
a construction area of 2400 square meters. Soil movement will be greater
that 10,000.00 cubic meters in cuts and landfills, no disposal of soil
will be done outside the project and soil and waste rubble will be taken
care of within the project (according to MINAE decret # 33959-MINAE Gaceta
# 244 December 19, 2007). The project will have drinkable water provided
by the Water and Sewage Administrative Association of Santa Rosa and Guatemala
(ASADA SANTA ROSA) and 2 drilled wells (According to drilling permits
IMN-DA-1884-2008 perforation # VI-184 for domestic use and irrigation,
and IMN-DA-1884-2008 perforation #VI-183 for domestic use, irrigation
and cattle feeding. Electricity will be supplied by COOPEGUANACASTE, RL.
Rain runoff and soil use certificates are supplied by Municipalidad de
Santa Cruz . Garbage collection will be done by Environmental Solutions
of Guanacaste, and the treatment of waste water will be taken care by
5 treatment plants, output will be used for irrigation (waste water plants
permits is added to this document). |
|||
BLACK STALLION OFFICIAL LAND LINE NUMBER:
This telephone number is now our main Black Stallion land line with voice mail.
Please make sure you have it in you data base thanks.
Office and land line in Costa Rica. + 506 - 2653 - 1828.